Speed Table Renovation (Extension) at SEC A and Geometric Correction of Sidewalk at JC Hoeffner Building

January 30, 2014

To: The University Community

Subject: Speed Table Renovation (Extension) at SEC A and Geometric Correction of Sidewalk at the Corner of JC Hoeffner Building

This is to inform the Ateneo community that the SEC A – LS Lower East Carpark speed table located along Father Masterson Drive will be renovated on January 31, 2014 until February 03, 2014.

In addition to the above activity, there will be a geometric correction of the sidewalk at the JC Hoeffner Building. The affected sidewalk is near the corner of Parade Loop and Father Arrupe Road. Construction work will start on January 31, 2014 until February 03, 2014.

The contractor of this project is J.A. Rementina Engineering Services. During the construction period, portions of the affected roadways will be closed to traffic:

  • Parade Loop corner Father Arrupe Road
  • SEC A – LS Lower East Carpark (Father Masterson Drive)

Thank you for your understanding and cooperation. Rest assured, we will continue to improve our road networks and create a more walkable campus.

Ma. Victoria Panlilio-Dimalanta
OIC – Central FMO

Advertisements

About ateneophysicsnews
Physics News and Features from Ateneo de Manila University

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: